Location: Alabama, Georgia, Indiana, Kentucky, Maryland, Massachusetts, Michigan, Mississippi, North and South Carolina, Nebraska, Oregon, Pennsylvania, Texas, and Virginia

NPDES Construction General Permits (GCP) compliance and litigation assistance for solar farm developments

At NAI, we bring unparalleled expertise in navigating the complexities of construction stormwater and general permit requirements, both federally and across multiple states. Choose NAI for a partner who understands the intricacies of both federal and state-specific stormwater regulations, and trust us to deliver comprehensive, tailored solutions for all your solar farm construction permit needs.

NAI understands the intricacies of both federal and state-specific construction stormwater regulations, and has developed a comprehensive, tailored project approach for use by solar farm owners and operators to ensure the site remains in compliance.

Our deep knowledge of the U.S. EPA’s Construction General Permit (GCP) ensures that we guide clients through stringent federal standards with precision. Our experience extends to specific state requirements in Georgia, North and South Carolina, Virginia, Kentucky, Pennsylvania, Oregon, Alabama, Nebraska, Indiana, Mississippi, Texas, Maryland, and Michigan. Each state has its unique regulations and nuances, and our team excels in customizing strategies to meet these diverse needs efficiently with the ultimate goal of protecting downstream properties and aquatic resources.

Services Provided

From project planning and design, initial permit applications, and compliance monitoring and reporting, NAI’s seasoned professionals are equipped to handle every aspect of construction sites’ erosion and sedimentation control program. We ensure that our clients meet all legal obligations, minimize or eliminate environmental impacts, and maintain project compliance.

In addition to our regulatory expertise, NAI offers comprehensive support in several critical areas:

  • Personnel Training: We provide targeted training programs to ensure that your team is well-versed in permit requirements and best practices for construction stormwater management and compliance.
  • Compliance Sampling and Inspections: Our experts conduct thorough sampling and inspections to verify adherence to permit conditions and identify areas for improvement.
  • Event Reporting: We manage or offer assistance for all aspects of event reporting, including on-site documentation and reporting of permit violations and compliance issues.
  • Required Project Records: NAI ensures meticulous maintenance of all required project records, providing you with organized, accessible documentation for audits and reviews.
  • Project Compliance Audits: We perform detailed compliance audits to assess adherence to regulations, identifying potential issues and recommending corrective actions.
  • Design and Review of Project SWPPPs: Our team specializes in designing and reviewing Stormwater Pollution Prevention Plans (SWPPPs) and Erosion Sedimentation and Pollution Prevention Plans (ESPCPs), ensuring they are comprehensive, effective, and aligned with both federal and state requirements.

Solar panels within a solar farm development. (image 1/3)

Solar panels within a solar farm development.

Solar panels on brush in a solar panel farm. (image 2/3)

Solar panels on brush in a solar panel farm.

Aerial view of a solar panel farm. (image 3/3)

Aerial view of a solar panel farm.

Rely on the environmental experts